Some Holloway Consulting’s renovation and restoration projects will be addressed here and others at our Renovation and Restoration project blog:
RESIDENTIAL DUPLEX – HISTORICAL PRESERVATION, DENVER
This case involved a fire that occurred during the renovation of a historical duplex residence in the old residential section of Denver. The fire was caused by the painting subcontractor’s negligence through leaving a pile of cleaning rags that combusted and started the fire. The insurance carrier obtained three repair cost estimates and bids from its adjusters, and all were around $2,000,000. However, the actual costs incurred by our client were greater. Therefore, Holloway Consulting was retained by the owner to:
- Determine reasonable cost to rebuild the duplex at the time of the fire.
- Explain the difference between State Farm’s payment and the actual cost to rebuild.
- Assess contributory negligence – our client saw the rags on the floor but did not appreciate the danger.
- Determine the percent complete of the renovation at the time of fire.
ADAMS PLACE CONDOMINIUMS, CINCINNATI, OHIO
Holloway Consulting was retained by attorneys for the Construction Manager to develop opinions and prepare expert reports on causation and Construction Management standard of care in a construction defects matter between the developer, CM, A/E and the trade contractors.
MISSION INN HOTEL, RIVERSIDE, CALIFORNIA
Steve Holloway was part of the general contractor’s team on this project.
SHERATON PALACE HOTEL, SAN FRANCISCO, CALIFORNIA
Steve Holloway was part of the general contractor’s team on this project.
HAMILTON COUNTY COURTHOUSE, CINCINNATI, OHIO
TOWN HALL, FIRE/DAMAGE/REBUILD; SILVERTON, COLORADO
Use this Search Engine to find the terms and information you need at our site.
And, the right side bar of each page here contains many related articles and posts.
The Holloway Consulting Group, LLC
Construction Advisers, Managers and Experts
12081 W. Alameda Pkwy., #450
Lakewood, CO 80228-2701
Denver Phone: (303) 984-1941
International Toll Free: (888) 545-0666
Fax: (303) 716-0432
Email: steve.holloway@disputesinconstruction.com
Blog: disputesinconstruction.com
Web: hcgexperts.com
_________________________________________
See Related Selected Pages at our site hcgexperts.com (2-12-12)
- CPM Scheduling
- Differing Site Conditions
- Differing Site Conditions 2
- Differing Site Conditions Claims – Types 1 and 2
- DSC Claims
- Differing Site Conditions 3
- Defective Plans And Specs
- Defective Contract Documents
- Defective Documents
- Subcontractor Claims Consultant
- Bid Preparation
- Bidding And Staffing
- Fixed-Price Contracts
- Acceleration and Delays
- Acceleration Costs
- Providing Notice
- Constructive Acceleration
- Directed Acceleration
- Contract Provisions
- Schedule Acceleration Claims
- Herbicide Production Unit; Texas
- Polyethylene Unit; Louisiana
- Crude Oil Refinery Upgrade Projects; Louisiana
- Ammonia Production Units; Louisiana
- Off-Shore Oil Production/Pipelines; Saudi Arabia, Louisiana