The expert’s indiscriminate use of labor productivity studies is a sure-fired way for him/her to lose credibility. Holloway Consulting is a construction damages and labor productivity expert, and we have experience with the most popular studies, including NECA’s periodic studies.

NATIONAL ELECTRICAL CONTRACTORS

LABOR PRODUCTIVITY

1962 MEMBER SURVEY

The National Electrical Contractors Association (“NECA”) has published numerous valuable studies on construction labor productivity and overtime. For example, in a 1962 survey, members replied to four questions concerning the effects of overtime on a sporadic, short-duration basis and two questions concerning continuous overtime over several successive weeks. This is an extremely small sample considering that NECA has thousands of members. Nevertheless, NECA concluded that the observations were close enough to give substantial confidence in the applicability of BLS values to electrical contracting which provided a more complete coverage.

Notwithstanding NECA’s conclusion, it must be reiterated that on one hand the BLS data were collected under very specific conditions in the manufacturing sector and, on the other hand, NECA data were a limited survey, i.e., data which cannot be verified. In this case, the similarity of questionable data can be considered a general indicator.

OVERTIME AND PRODUCTIVITY IN ELECTRICAL CONSTRUCTION, NO. 1

In 1969, NECA published, “Overtime and Productivity in Electrical Construction”, a study conducted by the NECA Southeastern Michigan Chapter. Data are from jobs worked during 1964, but the origin of the data and the work environment are unknown. This study showed a decline of productivity over periods of one to four successive weeks, but failed to address weeks thereafter.  Weeks 2, 3 and 4 simply use multipliers of 1.5. 2.0 and 2.5, respectively, of the first week’s data. This raises some concerns with respect to the originality and veracity of the data.

OVERTIME AND PRODUCTIVITY IN ELECTRICAL CONSTRUCTION, NO. 2

In 1989, NECA published a second edition of “Overtime and Productivity in Electrical Construction.” The study provides information on low, average and high productivity loss for 5-, 6-, and 7-day work weeks and 9, 10 and 12 hours per day for sixteen successive work weeks, based on data gathered by NECA since 1969 for journeymen electricians. The origin of the data and the nature of the work environment are unknown.

CLOSING

NECA prepared these construction labor productivity studies to be used by its members. Please contact Holloway Consulting at (303) 984-1941 to discuss your labor productivity claim.

Use this Search Engine to find the terms and information you need at our site.

And, the right side bar of each page here contains many related articles and posts.

The Holloway Consulting Group, LLC
Construction Advisers, Managers and Experts<
10885 W. Beloit Pl
Lakewood, CO 80227
Denver Phone: (303) 984-1941

We're sorry, but comments are closed.




Leave your comment:

 
SiteLock