Some of Holloway Consulting’s power construction projects to be addressed here and others at our blog Power Facility Project Disputes:
HEAT RECOVER STEAM GENERATORS (FOSSIL FUEL)
This case involved a dispute between (1) the subcontractor who provided the design, manufacturing, and supply of the Heat Recovery Steam Generators (HRSGs), and (2) the contractor who did the field installation work.
The essence of the dispute and the focus of Holloway Consulting’s work was the differences between bid HRSG installation scope/cost and incurred scope/cost. Holloway analyzed our client’s RFQ and final piping drawings and documents and prepared a Cost Variance Analysis and damages analysis to establish the compensable and/or non-compensable installation costs. In summary, Holloway found that the installation contractor underbid the small bore piping, large bore valves, large bore welds, shop fabricated piping field cuts/bevels, large bore hangers, blow-down system scope, silencer steel, platform steel, and was not entitled to the amounts claimed. Our client achieved a very favorable resolution in arbitration.
NOX SCRUBBER UNIT; TENNESSEE
Holloway personnel were retained by a mechanical contractor to evaluate cost overruns and schedule delays experienced on an NOX scrubber retrofit project for a large coal fired power plant project. The scope of work included bid estimate, change order, incurred cost and cost variance analyses; schedule delay analysis, labor productivity analysis and preparation of contractor affirmative claims.
PERRY NUCLEAR POWER STATION
Holloway worked on behalf of the reactor vessel designer/supplier in defending $3 billion in claims made by the utility consortium owners, primarily relating to the adverse effects of hydrodynamic loads on plant design, NRC approvals, and construction costs. Holloway performed numerous technical issue, contract, delay and labor productivity analyses, and issued expert reports on various issues relating to entitlement, causation and damages. The case was settled for a small fraction of claimed damages.
COMBINED CYCLE CO-GENERATION; NEW JERSEY, WEST VIRGINIA, AND CONNECTICUT (2), TEXAS
GRAND GULF NUCLEAR POWER STATION
FOSSIL FUEL UNIT; INDIANA
CONDENSER TUBE REPLACEMENT; TENNESSEE
Use this Search Engine to find the terms and information you need at our site.
And, the right side bar of each page here contains many related articles and posts.
The Holloway Consulting Group, LLC
Construction Advisers, Managers and Experts
12081 W. Alameda Pkwy., #450
Lakewood, CO 80228-2701
Denver Phone: (303) 984-1941
International Toll Free: (888) 545-0666
Fax: (303) 716-0432
Email: steve.holloway@disputesinconstruction.com
Blog: disputesinconstruction.com
Web: hcgexperts.com
_________________________________________
See Related Selected Pages at our site hcgexperts.com (2-12-12)
- On-Shore Natural Gas Pipelines Claims Saudi Arabia
- On-Shore Gas/Oil Separation Units (GOSP); California, Saudi Arabia
- Claims Refinery
- Petro-Chemical Dispute Experts Colorado
- Chemical Plant Colorado
- Damages Expert Labor Productivity Analysis
- Expert in Schedule Acceleration
- Scheduling Expert Acceleration
- Estimating Experts
- Change Order Experts
- Cost Estimating Experts
- Owner Superior Knowledge
- Power And Industrial Project Scheduling
- Scheduled Overtime Effect on Projects
- Labor Productivity Damages
- Schedule Acceleration
- Scholarly Publications
- Defects Experts EIFS
- Defects Experts Hotels
- Damages Expert Witnesses
- Power Generation Facility Experts
- Onshore Offshore Pipeline Projects Disputes
- Damages Mining Experts Projects
- Refinery Petro-Chemical Project Experts