• Service Categories
  • Holloway Consulting has been retained on numerous casino/hotel construction projects and disputes, the first three of which are described at Casino – Hotel Construction Claims:

    Hotel Casino Design and Construction Experts

    RITZ-CARLTON HOTEL AND CASINO, LAKE LAS VEGAS

    BELLE CASINOS; TUNICA AND BILOXI, MISSISSIPPI

    HARRAH’S, NEW ORLEANS, LOUISIANA

    HARRAH’S TOWER & LOWRISE EXPANSION, SHREVEPORT, LOUISIANA

    Holloway Consulting was retained in this casino/hotel dispute as the expert by the general contractor and its insurance carrier to investigate the causes and sources of water intrusion and mold infestation, and the resultant damage to work in place, hotel schedule delays and claims.

    PARAGON HOTEL/CASINO, LOUISIANA

    The case involved mold infestation during construction of the hotel/casino, which caused the work in-place to be torn-out and replaced. Working as the expert, Holloway found that the Contractor was responsible for construction means and methods, scheduling and coordinating the work, and ensuring that the work was performed according to industry standards and the contract documents. The Contractor’s improper sequencing of construction work, and inadequate control of construction-related moisture contributed significantly to the introduction of moisture and mold in the hotel. For example, contrary to industry practices, the Contractor finished the ground floor first, and then completed the upper floors. The Contractor also hung drywall before the building was dried-in, and the Contractor failed to ensure that draft stop was installed in the building attic. These and other Contractor-caused factors resulted in mold and the related damages.

    NORTHERN WINZ CASINO, MONTANA

    Holloway Consulting was retained by counsel for the GC to provide consulting and expert witness services relating to the design and construction of the Northern Winz Casino and the subsequent arbitration. The primary issue in the arbitration was whether or not the Owner’s termination of our GC client was wrongful, for convenience or for cause. The panel agreed with Holloway’s testimony on causation and damages and awarded our client all incurred costs plus markup.

    Contact Steve Holloway – Toll Free – at 888-545-0666 about your requirements

    Holloway Consulting
    Hotel and Casino Construction Experts
    12081 W. Alameda Pkwy., #450
    Lakewood, CO 80228-2701
    Denver Phone: (303) 984-1941
    International Toll Free: (888) 545-0666
    Fax: (303) 716-0432

    Email: steve.holloway@disputesinconstruction.com
    Blog: disputesinconstruction.com
    Web: hcgexperts.com

    _______________________________________________________________________________________________________________

    See Selected Pages at hcgexperts.com, a/o 12-20-11

    | Construction Scheduling Consultants | Construction Schedule Consulting | | Construction Management Services | Claims Services | Claims In Construction | Construction Claims Consultant | Construction Consultants | Construction Claims Expert | Project Scheduling Consultants | Scheduling Consulting Firm | CPM Scheduling | Construction Contractor Claims | Claims Consultants | Holloway Claims Consultants | Differing Site Conditions Claims | Contractor Claims Consulting | Defective Plans and Specs | Defective Contract Documents | Construction Consultant | Fixed Price Contracts | Schedule Acceleration | Design, delays and defects | Damages Analysis | Oil & Gas Project Claims | Pipeline Projects | Power Generation Projects | Delay Analysis Publications |




    Leave your comment:

    Contact Us Today

    The Holloway Consulting Group, LLC 12081 W. Alameda Pkwy., #450 Lakewood, CO 80228-2701

    Denver Phone: (303) 984-1941 International Toll Free: (888) 545-0666 Fax: (303) 716-0432

    Email: steve.holloway@disputesinconstruction.com